Construction was recently completed on a new, state-of-the-art campus gateway facility at Crawford High School located within the San Diego Unified School District. The 3-story facility features student services, administrative offices, a new theater, and twenty (20) new instructional spaces. Turpin & Rattan Engineering, Inc. was proud to work with Sprotte+Watson Architecture and Planning and the entire Architectural/Engineering and Construction team on this innovative and transformative educational facility.